Mussafah Storm Water Network, the project start on 2002, which was very important. The project total length of the pipe works 14,000 LM pipes Dia from 800mm until 2,400mm and the Network for the Storm Water include the manholes in main lines,Inlets and catch basin in civil works. Constructed different types of manholes as per the depth.