Contract 940/3

Project Description:


Construction of Sewerage Line for Plots C70 and C71 in Sector E25 WO 184 is very important project as miscellaneous works in town. The work order is 1,000Lm in different size of pipes, GRP and uPVC pipes and different manholes and connection to the existing about 7m depth, and four road (NDM works) and over-pumping as per specification.

nn

Construction of Network Storm Water lateral line to the main line. WO 166 is very important and the location is in the town with a lot of existing surface obstructed our work and the number of inlets is around 40 and the pipelines is more than 700Lm. The type of the pipe is GRP 500mm dia.This work order surface to the investment building in Al Salam Street.

Scope of Work:
  • Dewatering System
  • Design and Implementation
  • Surveying the sites with NOC of the services from Authorized departments.
  • Investigation for the Trial pits for the existing services and we submitted to the consultant through the main contractor
  • QA/QC for the vendor list approved
  • Cost Control
  • Planning
  • Procurements
  • HSE rules and regulations
  • Construction Management
  • Supervision of the installation pipeline
  • Testing of pipelines
  • Commissioning
  • Handover as per as built drawings.
  • PROJECT DETAILS


    • Project Name : Construction of Miscellaneous Roads and Parkings in Abu Dhabi City, Fourth Stage Contract 940/3
    • Location : Abu Dhabi
    • Value of Project : 29,600,000.00 Dhs
    • Clients : Abu Dhabi Municipality
    • Consultant : DORSH Group, Samer Group
    • Main- Contractor : Al Fahjan Transportation and General Contracting Est.
    • Sub- Contractor : Tetra Emirates Gen. Cont. & Maint. CO. L.L.C
    • Starting Date : May 2011
    • Completion Date : 15th June 2012