WATER SUPPLY
Construction of Water Supply System for 400-villas. The quantity of the pipe is 8,000Lm in different chambers, gate valves, air valves…etc., and connection to the existing and the pipe is HDPE. The number of chambers is around 59 and 400-villas chamber connection.
Scope of Work:
1. Design and Implementation
2. Surveying the sites with NOC of the services from Authorized departments.
3. Investigation for the Trial pits for the existing services and we submitted to the consultant through the main contractor
4. QA/QC for the vendor list approved
5. Cost Control
6. Planning
7. Procurements
8. HSE rules and regulations
9. Construction Management
10. Supervision of the installation of pipeline
11. Testing of pipelines
12. Commissioning
13. Handover as per as built drawings

PROJECT DETAILS


  • Project Name : Watani Residential Development Project –Phase 2
  • Location : CompleKhalifa City A, Abu Dhabited
  • Value of Project : 11,193,000.00 Dhs – supply and installation
  • Hand Over Value : 11,193,000.00 Dhs – still on process
  • Clients : UPC, Sorouh
  • Consultant : PMDC Project Management, WSP Infrastructure Consultant and Mott MacDonald Consultancy
  • Main- Contractor : Construction General Contracting House, LTD.
  • Nominated Contractor : Tetra Emirates Gen. Cont. and Maint. Co. L.L.C.
  • Starting Date : December 2011
  • Completion Date : 15 September 2012