Al Salam Street -Irrigation


Al Salam Street Tunnel


Al Salam Street is one of the business streets in the city and Is considered as an arterial road. It is being upgraded to create an urban expressway featuring a network of roads and Tunnels that will eventually lead to a smooth free-flow facility. Upon completion of Al Salam Street Project, Motorists will be able to travel through Al Salam Street without any traffic signals from sheikh Zayed Bridge until the Mina Zayed area.


This will result in a much smoother traffic flow and faster travel time for thousands of motorists driving through this principal route.Al Salam Street Project is initiated by municipality of Abu Dhabi Municipality (Municipality of Abu Dhabi City) in response to the urban growth and population increase in the capital.
It is an effort to further establish Abu Dhabi’s position as a truly modern metropolis on par with the best in the world.



Tetra Emirates, as one of its subcontractors, takes pleasure in being a part of Abu Dhabi significant development. Tetra is the 1st contractor working in the big projects in a very professional way in Abu Dhabi.



Road Works
Construction of 25,000 LM detouring including 35,000 cu.m. curbstone and interlock (detouring).

Scope of Work:
1. Surveying the sites with NOC of the services from authorized departments.

2. Investigation for the Trial pits for the existing services and we submitted to the consultant through the main contractor

3. QA/QC for the vendor list approved

4. Cost Control

5. Planning

6. Procurements

7. HSE rules and regulations

8. Construction Management

9. Supervision of the installation of pipeline

10. Testing of pipelines

11. Commissioning

12. Handover as per as built drawings.





Project Details


  • Project Name : Upgrading Al Salam Street And Abu Dhabi City Ring Road Contract No.1 – Al Salam Street Tunnel Project(IRRIGATION RELOCATION SYSTEM)
  • Location : Abu Dhabi
  • Value of Project : 12,896,000 Dhs
  • Clients : Abu Dhabi Municipality
  • Consultant : PARSONS International Limited
  • Main Contractor : Samsung Saif Bin Darwish –Joint Venture
  • Sub- contractor : Tetra Emirates Gen. Maint. Cont.Co.L.L.C
  • Starting Date : 01/06/2009
  • Completion Date : 13/08/2011