Construction of Sewerage connection and related works was very important project as miscellaneous works in The Abu Dhabi Island in different work orders values and Conditions. The total work Orders was 180 Nos, and using different Types of the GRP pipes from Dia 300mm until 900mm and uPVC from Dia 200mm until 500mm. The GRP manholes And some work orders replacement for existing manholes. We were using the over pumping and dewatering system, Deep dwelling, shoring system if the work orders required.



Scope Of Work:

1. Dewatering System.
2. Design and Implementation.
3. Surveying the sites with NOC of the services from Authorized departments.
4. Investigation for the Trial pits for the existing services and we submitted to the consultant through the 5. 5. main contractor
6. QA/QC for the vendor list approved
7. Cost Control .
8. Planning.
9. Procurements.
10. HSE rules and regulations.
11. Construction Management.
12. Supervision of the installation of pipeline.
13. Testing of pipelines.
14. Commissioning.
15. Handover as per as built drawings.




Project Details


  • Project Name : Construction of Sewerage connection and related works for Isolated Property in Abu Dhabi Island and Main Land-Phase 1
  • Location : Abu Dhabi
  • Value of Project : 144,000,000.00 Dhs
  • Hand Over value : 34,000,000.00 Dhs
  • Clients : Abu Dhabi Sewerage Services Company (ADSSC)
  • Consultant : DORSH
  • Main Contractor : Al-Jaber Energy Services
  • Sub- contractor : Tetra Emirates Gen. Maint. Cont.Co.L.L.C
  • Starting Date : 23-08- 2010
  • Completion Date : 28-11- 2011