Contracts 1/2010 & 940/3


Contracts 1/2010 & 940/3


A- CONTRACT 1/2010:
Construction of Proposed Storm Water Network including Connection to Existing System for Sheikh Zayed Grand Mosque, using NDM system and a special manholes.
B- CONTRACT 940/3:

1- Construction of Proposed Storm Water Network including Connection to Existing System at different locations (22 Work Orders), one of them was Work Order “166” for the investment building in Al Salam Street. A lot of existing services had obstructed our work. The number of inlets was around 40 and the pipelines is more than 700Lm. The type of the pipe was GRP 500mm dia and 300 mm dia.


2- Construction of Sewerage Line for Plots C70 and C71 at Sector E25. Work order “184” was a very important project as miscellaneous works in town. The work order consist of 1,000Lm in different size of pipes, GRP and uPVC pipes and different manholes and connection to the existing about 7m depth, and four road (NDM works) and over-pumping as per specification.

Scope Of Work:

1. Dewatering System.
2. Design and Implementation.
3. Surveying the sites with NOC of the services from Authorized departments.
4. Investigation for the Trial pits for the existing services and we submitted to the consultant through the 5. 5. main contractor
6. QA/QC for the vendor list approved
7. Cost Control .
8. Planning.
9. Procurements.
10. HSE rules and regulations.
11. Construction Management.
12. Supervision of the installation of pipeline.
13. Testing of pipelines.
14. Commissioning.
15. Handover as per as built drawings.




Project Details


  • Project Name : 1- Maintenance, Rehabilitation and Additional Works for Roads and Bridges of the Emirates of Abu Dhabi, Abu Dhabi island (Contract 1/2010). 2- Construction of Miscellaneous Roads and Parkings in Abu Dhabi City, Fourth Stage Contract 940/3 (23 Work Orders)
  • Location : Abu Dhabi
  • Value of Project : 15,500,000.00 Dhs
  • Clients : Abu Dhabi Municipality
  • Consultant : Al Fahjan Transportation and General Contracting Est.
  • Main Contractor : : Al Fahjan Transportation and General Contracting Est.
  • Sub- contractor : Tetra Emirates Gen. Maint. Cont.Co.L.L.C
  • Starting Date : April 2010
  • Completion Date : 15th June 2012