Diversion of Existing Storm Water Pipeline-Khalifa
Diversion of Existing Storm Water Pipeline, relocation of Storm Water pipeline of Dia 1600mm and 1800mm GRP near shooting club and the total manholes 25 Nr of different types. Tetra Emirates complete this Project in high quality and safety standards and our Dewatering system specialized team work achieved The length of 2000 LM. Investigation reported That the soil is very critical i.e, clay soil but Our specialized team becomes successful Due to their skills and expertise.
Scope Of Work:
1. Dewatering System.
2. Design and Implementation.
3. Surveying the sites with NOC of the services from Authorized departments.
4. Investigation for the Trial pits for the existing services and we submitted to the consultant through the 5. 6. main contractor
7. QA/QC for the vendor list approved
8. Cost Control .
9. Planning.
10. Procurements.
11. HSE rules and regulations.
12. Construction Management.
13. Supervision of the installation of pipeline.
14. Testing of pipelines.
15. Commissioning.
16. Handover as per as built drawings.